For trades working on boardRefit and outfitting of yachts and ships. From 1 to 10 workers: joiners, drywallers, painters, insulators, electricians, plumbers.

Coming soon

Your crew on board. Every snag closed.

Hours by deck and by space, the owner's snags on the plan, signed extra work, materials from the store. Everyone reads in their own language.

Tell me when it opens →

Made by a ship outfitting site manager with 43 years on the job.

M/Y Aurora · Deck 3
Log hourstoday · 5 workers · 40 h
Owner's snags73 urgent
Extra hours12to sign
Work done58%
Delivery20/03on time
Materials from the storeMS60 sealant white · 12 cartridges
Walkthrough with the ownerFriday · guest cabins
30″to log the whole crew's hoursBy deck, by space, by job.
1pin on the plan for every snagWith the photo, the frame and who must close it.
0extra hours lostEvery extra hour has a photo and a signature.

See how it works.

Three screens you use every day on board.

Deck 3 · guest cabins · frames 40–72 Cabin 1Cabin 2Cabin 3Cabin 4 Cabin 5Cabin 6Cabin 7Cabin 8 SaloonCorridor fr. 4048566472 R12 R14 R15 R7 R9 R3 R5 R15 · Panel joint not aligned ● Now · Ionuț
To do In progress Checked, ready for the owner
Snags

The walkthrough with the owner, on the deck plan.

The captain or the surveyor points at a panel, a joint, a visible screw. Tap the spot, take the photo, give it to your worker. A red dot means right now.

Once fixed you check it and it turns green. On the next walkthrough you open a clean list and close everything, with the PDF to send to the yard.

Extra hours · TS 014
Cabin 3 · redo the headboard✓ Signed
Requested byOwner · fabric change
When14/03 · 07:30–13:30
WorkersIonuț, Paweł · 2 × 6 h
Total12 h extra work
Yard signatureM. Ferrari · 14/03
Extra hours

Extra hours you actually get paid for.

Every job outside the contract has its own sheet: who asked for it, before and after photos, the workers and the hours. The manager signs on the phone.

At month end you send the report to the yard. No more forgotten or disputed extra hours.

Contract vs real hours · by space Owner's cabinSaloonGuest cabinsCorridors 104 / 120 h190 / 160 h · +19%196 / 200 h78 / 60 h · +30%
ContractReal, on timeReal, over the contract
Your margin

You know which space is losing you money.

Enter the contract hours for each space. ceck compares them with the real ones, including snag rework and redone jobs.

You see it while the ship is still in the yard. And on the next refit you know what to charge.

Materials

The store order in one minute

Type the quantities, ceck sends the PDF to the store, translated if needed, and keeps you a copy.

Order · M/Y AuroraQty
MS60 sealant white 600 ml12
Self-drilling screws 3.9 × 252 boxes
Masking tape 50 mm10 rolls
Samples

The approved sample, signed on the phone

Products, batches, photos of each step. Quality control and the owner sign with a finger: after that nobody can change it.

Quality control
Owner
Languages

Every worker reads in their own language

English, Italian, Romanian, Polish, French, Spanish, German. Under every text, the second language.

Redo the panel joint in cabin 3Rifare la fuga del pannello in cabina 3
Walkthrough with the owner on FridayGiro con l'armatore venerdì
Why it works

It's not office software. It's made for people on board.

Big buttons, little text, the deck and the space always in view. If you don't know how, ask the help: it answers in your language.

Try ceck

Interested?

We send you the link and a sample ship project already set up, so you see straight away how it works.